Project Category: Adaptive Reuse

Main Street Theater Restoration

he downtown Fitchburg Theater Block consists of a 2-story commercial building and a 1,751-seat performance/movie theater. The theater opened on February 7, 1929 as a movie house with live (often Vaudeville) performances and a Wurlitzer Style 190-pipe organ. The last time the theater was used was the early-1980’s, and it has seriously deteriorated since then. Thirty years […]

View full post

Centre 50 & Enso Flats

Centre 50 and Enso Flats are the first residential phase of a new multi-acre, mixed-used downtown redevelopment in the gateway city of Brockton. This new, mixed-use district includes the restored Enterprise Block, 200,000 SF of new office space, residences, and a restaurant and retail area. The residential component includes 250 apartments located within a one-block […]

View full post

110 Canal (Core + Shell)

As part of the Hamilton Canal District Redevelopment, this reuse of a 1930’s former industrial building provides a mix of office and commercial space while combining historic appeal with downtown convenience. Located at the intersection of three historic waterways, 110 Canal offers open floor plans and visually stunning interiors profiling the raw, concrete frame of the […]

View full post

The Distillery

As one of the first multifamily Passive House buildings in New England, and the first in Massachusetts, The Distillery in South Boston is designed to meet the world’s most energy efficient performance standard, with energy savings of 60% over conventional construction. Ultimately intended to expand to 65 units, the 28-unit new building supports and enhances […]

View full post